This area was originally a cupboard, Bathroom and separate toilet with hand basin.
We removed all of the internal walls and moved the wall out where the bath is now positioned, blocked up two doors to create a large area to install a Beautiful stand alone bath with wall mounted tap, we had to move heating pipes, waste pipes and hot and cold feeds and much more.
The door was blocked up to create the shower area. The whole area was fully boarded and plastered including the ceiling where we installed new spot lighting and de misting LED Mirror. Ceramic sink and unit.
We prepared the floor and walls ready for the Ceramic tiles to complete the project.
We carried out a full renovation to the Main Bathroom installing all new Plumbing, Wall and Floor Tiling, Block Oak Top and Ceramic Basin, Block Oak Window Cill, Mirrored Wall unit with L E D Lighting, Thermostatic Bar Shower, Toilet with Concealed Cistern, Bath with Shower Screen and Chrome Towel Radiator to complet
Preparation work including removal of existing bathroom. Sometimes damage can occur to plaster boards during the removal process, this is sometimes unavoidable .We are able to reinstate and repair in order to complete the project.